Vigilex V-FLEX anti-explosion panels

Donat Czapski

Donat Czapski – I am at your disposal

+48 695 244 220

info@grupa-wolff.com

Design
Delivery
Installation
Service

We know the requirements of insurers

From ATEX AUDIT to protection implementation

We provide 24/7 service

 Vigilex V-FLEX anti-explosion panels

Standard technical data:

  • Maximum vacuum resistance 200 mbar (optionally 500 mbar),
  • Opening pressure 100 mbar +/- 15% at 20°C,
  • Design single flat,
  • Frame sealing made of EPDM (from -40°C to 80°C),
  • Integrated stainless steel flange,
  • KST MAX 350 bar x m/s without additional flange,
  • KST MAX 500 bar x m/s with additional flange,
  • Efficiency index 80% – 100%,
  • Possibility of mounting on curved surfaces – curve radius according to order.

Option VD Sanitary:

  • Panel material stainless steel 316 L,
  • Full frame silicon FDA gasket (-60°+220°C),
  • Integrated stainless steel 316L flange,
  • Other vacuum resistance avaiable.

Rectangular & Square Vigilex VL-FLEX anti-explosion panels

Inside dimensions [mm]Outside dimensions [mm]Vent area [cm²]
229x229310x310515
305x457386x5381385
340x440404x5041355
375x655460x7402445
410x410480x4801660
490x590570x6702865
586x920666x10005360
645x645740x7404095
669x669740x7404460
920x9201010x10108460
980x9801080x10809600

Model approach to explosive safety in an industrial plant

Model approach to explosive safety in an industrial plant

Step 1
ATEX Audit

During the ATEX Audit, we will focus on deficiencies in explosive safety and indicate tasks that should be performed first to have the strongest impact on safety improvement.

Model approach to explosive safety in an industrial plant

Step 2
Protection Concept

The result of the ATEX Audit is also a preliminary concept of protecting the installation from explosion. It allows estimating the costs of protections. After testing the explosiveness parameters of the dust from the installation, we move on to the final concept and design.

Model approach to explosive safety in an industrial plant

Step 3
Design and selection of protections

After accepting the concept and testing the explosiveness parameters of the dust from the installation, we proceed to the final selection of explosion protections and create a design that takes into account all required changes in production.

Model approach to explosive safety in an industrial plant

Step 4
“Turnkey” delivery and installation

We coordinate the entire delivery and installation process of protections. We have our own service teams with experience in performing installation without the need to stop the investor’s plant operation.

Model approach to explosive safety in an industrial plant

Step 5
Execution of ERA and EPD

We conduct a post-implementation Explosion Risk Assessment (ERA) and prepare (or update) the Explosion Protection Document (EPD). We usually also conduct training for the crew in the field of explosive safety.

Secure your industrial plant

Completed projects

Knowledge base

Do you have any questions?

Donat Czapski Grupa WOLFF zdjecie
DONAT CZAPSKI - I am at your disposal

We will answer questions about: offer, technical specification, delivery, assembly.

or send your inquiry