The MULTIPOINT II system is a device designed to control the earthing of up to 8 self-acting or interconnected system components at the same time. According to the guidelines of international standards for the control of unwanted static discharges, the correctness of earthing will only be confirmed by the system if the resistance of the earthing node on each channel is less than 10 Ω. If this condition is not met, the system will block the technological process.
Latest blog posts
- Fire pumping station and fire water tank for the combined power plant
- Long-term cooperation of WOLFF GROUP with a major energy and heat group
- HARDO – the new Polish manufacturer of lighting fixtures and other electrical equipment for hazardous areas
- An explosion in the food industry that changed everything. A case study and changes implemented by the WOLFF GROUP
- Explosive coal and biomass may be the next problem for the power sector in the autumn
- 7 things you can do to minimise the risk of hydrogen ignition caused by electrostatic discharge
- Dust monitors for dust collection systems