EX 100.1 si zone control panel

EX 100.1 si zone control panel
Donat Czapski

Donat Czapski – I am at your disposal

+48 695 244 220

info@grupa-wolff.com

Design
Delivery
Installation
Service

We know the requirements of insurers

From ATEX AUDIT to protection implementation

We provide 24/7 service

EX 100.1 si zone control panel

Applications

  • A control feature for the explosion suppression system that manages the HRD cylinders, pressure sensors and IR detectors.
  • The CIE single zone control unit provides explosion suppression system monitoring, relays the stored energy impulse to trigger the HRD cylinders, and on-line verification of the system status.

Specifications

  • The CIE control unit receives, controls and evaluates the outputs from pressure, spark, flame and temperature detectors.
  • The system detection and activation lines are continuously monitored for shorting and loss of ground.
  • Backed up with battery power for continued operation in the event of a mains loss.
  • Supports remote arming, putting offline and reset commands.
  • Protection type: IP66, application: Zone 22, ambient temperature: +5°C to +50°C.
  • ATEX-compliant design.

Model approach to explosive safety in an industrial plant

Model approach to explosive safety in an industrial plant

Step 1
ATEX Audit

During the ATEX Audit, we will focus on deficiencies in explosive safety and indicate tasks that should be performed first to have the strongest impact on safety improvement.

Model approach to explosive safety in an industrial plant

Step 2
Protection Concept

The result of the ATEX Audit is also a preliminary concept of protecting the installation from explosion. It allows estimating the costs of protections. After testing the explosiveness parameters of the dust from the installation, we move on to the final concept and design.

Model approach to explosive safety in an industrial plant

Step 3
Design and selection of protections

After accepting the concept and testing the explosiveness parameters of the dust from the installation, we proceed to the final selection of explosion protections and create a design that takes into account all required changes in production.

Model approach to explosive safety in an industrial plant

Step 4
“Turnkey” delivery and installation

We coordinate the entire delivery and installation process of protections. We have our own service teams with experience in performing installation without the need to stop the investor’s plant operation.

Model approach to explosive safety in an industrial plant

Step 5
Execution of ERA and EPD

We conduct a post-implementation Explosion Risk Assessment (ERA) and prepare (or update) the Explosion Protection Document (EPD). We usually also conduct training for the crew in the field of explosive safety.

Secure your industrial plant

Completed projects

Knowledge base

Do you have any questions?

Donat Czapski Grupa WOLFF zdjecie
DONAT CZAPSKI - I am at your disposal

We will answer questions about: offer, technical specification, delivery, assembly.

or send your inquiry