SYSTEMS FOR EXCEPTIONALLY DIFFICULT WORKING CONDITIONS

The system was designed by the WOLFF GROUP’S design office. The design had to take into account all systems required for the particular working conditions, including air conditioning systems and protection against the effects of explosion. Based on the design, we manufactured the key components of the system, including the filtration unit, pipeline elements and steel structures.

Complete elements and necessary tools were transported to Dubai by sea. This stage required particular care and perfect organisation. The lack of any of the components would result in significant delays and additional costs. After the arrival of the containers, we started the installation. Despite the difficult conditions, the task proceeded according to schedule. Our work was completed by the commissioning of the system and providing training for the local employees. The whole task, despite its logistical complexities, was completed quickly and efficiently.

SUPPLY OF A DUST EXTRACTION SYSTEM FOR ONE OF THE HOTTEST PLACES ON EARTH

SCOPE OF WORKS: Design, production, supply, installation, implementation and startup of the explosion protection system.

LOCATION: United Arab Emirates – one of the hottest places on Earth. The average summer temperature in Dubai is 42°C in the shade.

Do you have any questions?

Donat Czapski Grupa WOLFF zdjecie
DONAT CZAPSKI - I am at your disposal

We will answer questions about: offer, technical specification, delivery, assembly.

or send your inquiry